Foundation for the Dream


Just keep in mind the vision of the dream house! The far right on the drawing is the existing timber frame structure that will be remodeled and added on to.
The first step was to dig around the piling foundation and "beef it up" replacing rotton beams and adding real footers and foundation walls
.
Then it was time to dig the foundation for the addition: 3-car garage and indoor lap swimming pool.
30+ yards of concrete for the FOOTINGS.
The boys worked so hard all week, and without lunch on Friday to get the walls formed, braced, and poured before the weekend- GREAT job!
66 yards of concrete (6 trucks!) for the foundation WALLS.